Testing

Testing products goes through 4 stages:

 

1. Assess if can be reused or used for parts
2. Experienced engineer assess refurbishment requirements
3. Third stage:

  • Washing – full 90 degree wash test.  Checks for bearing wear, electrical faults and leakage.
  • Cooling – 12 hour temperature test
  • Cooking – Temperature tests

4. Full PAT Electrical Test